Process Pump Replacement & Sizing — Food Processing Plant
ManufacturingThika, Kenya2023COMPLETED

Process Pump Replacement & Sizing — Food Processing Plant

Failed transfer pumps replaced with correctly sized units: duty analysis, NPSH checks, alignment supervision and commissioning.

Client: Confidential client — food manufacturer • Service: Mechanical Engineering

Project overview

A food processing plant at Thika suffered repeated failures of its hot-water and CIP transfer pumps — seal failures, cavitation damage and chronic underperformance that throttled production.

Ventron's investigation showed the installed pumps had been selected for a duty the plant had long outgrown, with suction conditions guaranteeing cavitation. We re-specified the full pump train for actual operating duties.

Client challenge

Production losses were being treated as a maintenance problem — new seals every quarter — when the root cause was hydraulic: pumps operating far off-curve with NPSH available below required at operating temperature.

Ventron solution

We measured actual flows and temperatures, rebuilt the system curves including fouling allowances, and selected end-suction units running near best efficiency with verified NPSH margins. Suction pipework was enlarged at two stations, strainers and air-release provisions corrected, and installation supervised through alignment, grouting and loop testing. Seal life moved from months to years.

Scope of work

  • Duty measurement and system-curve reconstruction
  • Pump selection with NPSH verification
  • Suction pipework modifications
  • Installation supervision and commissioning

Engineering deliverables

  • Pump datasheets and selection report
  • Modified piping isometrics
  • Alignment and test records
  • Operating envelope and spares list

Stop Guessing. Get It Engineered.