Project overview
A food processing plant at Thika suffered repeated failures of its hot-water and CIP transfer pumps — seal failures, cavitation damage and chronic underperformance that throttled production.
Ventron's investigation showed the installed pumps had been selected for a duty the plant had long outgrown, with suction conditions guaranteeing cavitation. We re-specified the full pump train for actual operating duties.
Client challenge
Production losses were being treated as a maintenance problem — new seals every quarter — when the root cause was hydraulic: pumps operating far off-curve with NPSH available below required at operating temperature.
Ventron solution
We measured actual flows and temperatures, rebuilt the system curves including fouling allowances, and selected end-suction units running near best efficiency with verified NPSH margins. Suction pipework was enlarged at two stations, strainers and air-release provisions corrected, and installation supervised through alignment, grouting and loop testing. Seal life moved from months to years.
Scope of work
- Duty measurement and system-curve reconstruction
- Pump selection with NPSH verification
- Suction pipework modifications
- Installation supervision and commissioning
Engineering deliverables
- Pump datasheets and selection report
- Modified piping isometrics
- Alignment and test records
- Operating envelope and spares list
Related projects
Firewater Demand Assessment & Hydraulic Modelling — Petroleum Terminal
Mombasa, Kenya • Confidential client — petroleum terminal operator
Maximum water demand study, ring-main hydraulic model, pump duty verification and storage sizing for a coastal petroleum storage terminal.
View projectLPG Storage & Cylinder Filling Facility — Design & Documentation
Athi River, Kenya • Confidential client — LPG marketing company
Complete engineering package for an LPG storage and filling plant: vessel layout, piping, filling manifold, safety systems and fire interface.
View projectTank Farm Transfer Piping Revamp — Inland Depot
Eldoret, Kenya • Confidential client — depot operator
Rerouted transfer headers, pump re-selection, surge checks and full as-built documentation for an inland petroleum depot.
View projectStop Guessing. Get It Engineered.
Send drawings, BOQs or site photos — get a scoped proposal with deliverables, timeline and fee within 2 business days.