
LPG Gas-Detection System
Supply, installation, testing and commissioning of an LPG gas-detection system, including detector positioning, alarm interfaces and functional…
Client: Murimi Investment • Service: Procurement
Project overview
Delivered for Murimi Investment in Kitale, Kenya: supply, installation, testing and commissioning of an LPG gas-detection system.
Scope of work
- Supply
- Installation
- Testing
- Commissioning
- Detector positioning
- Alarm interfaces
- Functional verification
Engineering deliverables
- Installed gas-detection system
- Testing records
- Commissioning and verification records
Related projects
Firewater Demand Assessment & Hydraulic Modelling — Petroleum Terminal
Mombasa, Kenya • Confidential client — petroleum terminal operator
Maximum water demand study, ring-main hydraulic model, pump duty verification and storage sizing for a coastal petroleum storage terminal.
View projectLPG Storage & Cylinder Filling Facility — Design & Documentation
Athi River, Kenya • Confidential client — LPG marketing company
Complete engineering package for an LPG storage and filling plant: vessel layout, piping, filling manifold, safety systems and fire interface.
View projectTank Farm Transfer Piping Revamp — Inland Depot
Eldoret, Kenya • Confidential client — depot operator
Rerouted transfer headers, pump re-selection, surge checks and full as-built documentation for an inland petroleum depot.
View projectStop Guessing. Get It Engineered.
Send drawings, BOQs or site photos — get a scoped proposal with deliverables, timeline and fee within 2 business days.
