Fire Suppression Upgrade — Mixed-Use Commercial Complex
Hydrant ring, hose-reel coverage, booster sets and commissioning evidence for a Westlands commercial development.
Client: Confidential client — property manager • Service: Fire Protection Engineering
Project overview
The owners of a mixed-use complex in Westlands — retail podium, offices and residential towers — needed their fire systems brought to a demonstrably compliant, maintainable standard ahead of re-insurance.
Ventron audited the existing installations, designed the remediation, supervised the works and produced the commissioning dossier the insurers required.
Client challenge
Coverage gaps in the parking levels, an unreliable booster set, unlabelled zones and no test records meant the system could neither be proven nor maintained. Works had to proceed in an occupied building without disrupting tenants.
Ventron solution
A floor-by-floor audit mapped every deficiency to a drawing, and remediation was phased tower by tower with night works for noisy activities. The hydrant ring was extended to dead zones, booster duty/standby sets replaced with auto-changeover control, zones labelled and a full flow-test programme witnessed and recorded. The complex passed re-inspection on first presentation.
Scope of work
- Floor-by-floor fire systems audit
- Hydrant and hose-reel coverage remediation design
- Booster pump replacement specification
- Phased occupied-building supervision
- Witnessed flow testing and handover dossier
Engineering deliverables
- Audit report with marked-up drawings
- Remediation drawings and specifications
- Pump datasheets and control philosophy
- Commissioning and test records dossier
Related projects
Firewater Demand Assessment & Hydraulic Modelling — Petroleum Terminal
Mombasa, Kenya • Confidential client — petroleum terminal operator
Maximum water demand study, ring-main hydraulic model, pump duty verification and storage sizing for a coastal petroleum storage terminal.
View projectLPG Storage & Cylinder Filling Facility — Design & Documentation
Athi River, Kenya • Confidential client — LPG marketing company
Complete engineering package for an LPG storage and filling plant: vessel layout, piping, filling manifold, safety systems and fire interface.
View projectTank Farm Transfer Piping Revamp — Inland Depot
Eldoret, Kenya • Confidential client — depot operator
Rerouted transfer headers, pump re-selection, surge checks and full as-built documentation for an inland petroleum depot.
View projectStop Guessing. Get It Engineered.
Send drawings, BOQs or site photos — get a scoped proposal with deliverables, timeline and fee within 2 business days.