Boiler House & Utility Piping — Manufacturing Plant
Steam, condensate, water and compressed-air distribution redesign with support engineering for a Ruiru manufacturer.
Client: Confidential client — industrial manufacturer • Service: Mechanical Engineering
Project overview
A Ruiru manufacturer's utility costs and boiler-house incidents traced back to its distribution network: uninsulated steam runs, failed traps, water hammer and compressed-air leaks that kept two compressors running for one compressor's load.
Ventron redesigned the utility distribution as an integrated package — steam and condensate first, then water and air — with metering that let the plant finally allocate energy costs per line.
Client challenge
Fuel bills rising while production stayed flat, plus recurring water hammer events that threatened the boiler house. The plant needed lower losses and safer operation without a production shutdown longer than a weekend.
Ventron solution
Thermal imaging and flow logging quantified every loss before design began, so each recommendation carried a payback. Steam headers were resized and re-trapped, condensate recovery restored, air leaks surveyed and repaired under a managed programme, and supports and expansion provisions corrected throughout. Fuel consumption per tonne of output fell measurably within the first quarter.
Scope of work
- Utility loss survey with thermal imaging and logging
- Steam, condensate, water and air network redesign
- Trap, insulation and support specification
- Weekend-window installation supervision
Engineering deliverables
- Loss survey and payback-ranked recommendations
- Utility P&IDs and isometrics
- Equipment and trap schedules
- Metering plan and commissioning records
Related projects
Firewater Demand Assessment & Hydraulic Modelling — Petroleum Terminal
Mombasa, Kenya • Confidential client — petroleum terminal operator
Maximum water demand study, ring-main hydraulic model, pump duty verification and storage sizing for a coastal petroleum storage terminal.
View projectLPG Storage & Cylinder Filling Facility — Design & Documentation
Athi River, Kenya • Confidential client — LPG marketing company
Complete engineering package for an LPG storage and filling plant: vessel layout, piping, filling manifold, safety systems and fire interface.
View projectTank Farm Transfer Piping Revamp — Inland Depot
Eldoret, Kenya • Confidential client — depot operator
Rerouted transfer headers, pump re-selection, surge checks and full as-built documentation for an inland petroleum depot.
View projectStop Guessing. Get It Engineered.
Send drawings, BOQs or site photos — get a scoped proposal with deliverables, timeline and fee within 2 business days.